Funding entity Endesa Generación
The work responds to the request made by Endesa Generación S.A. to the researchers of the Institute of Technological Research (IIT) to elaborate a technical judgment on the determination of the update rate applicable to the economic damages caused by the affections to the hydroelectric system of Endesa Generación, to adopt the distribution of regulated flows in Rialp in its second phase.
2008_Segarra_Garrigues